The power plant is part of the colossal US$1.2-bil Ca Mau Gas-Power-Fertiliser Complex in the southern-most province of Ca Mau. PetroVietnam, will build several power plants to support the power usage of the complex.
Sembawang E&C’s work scope encompassed the Engineering, Procurement and Construction Services for balance of plant of 2 x 750 MW Combined Cycle Power Plant.
The systems included in the scope were Cooling water System, Chlorination Plant, Filter water Storage and Service water Supply System, Potable water Treatment and supply, Demineralized water system, Waste water Treatment System, Chemical Storage system, Fire Fighting System, Service Air and Instrument Air System, Natural Gas Supply system, Distilled Oil Storage and Supply System, Nitrogen Distribution System, Laboratory Equipment, Mobile Equipment and Vehicle, Work shop Equipment, Hoist and Cranes, Electrical Systems and Instrumentation and Control.
Engineering, Procurement and Construction of complete works in balance of plant for 2 numbers of 750MW Combined Cycle Power Plant
Punj Lloyd Ltd
Plate No. 2, Second Floor, Tower No. 2, NBCC Plaza, Sector V, Pushp Vihar, Saket, New Delhi-110017