Heera Field Redevelopment Project
- Project awarded by ONGC
- 4 new unmanned wellhead platforms
- 8 segments rigid pipelines of 6” to 16” dia x 57 km
- 3 segments flexible submarine pipelines of 140 mm internal diameter x 10.5 km
- 3 nos. composite cables (23 km) – power and fibre optic
- Replacement of SPM system in Mumbai High South
- Platform water depth : 49 to 62 meters
Major highlights :
- Total structural steel fabrication work exceeds 14000 MT
- Major modification on a process platform
- Project completed in May 2010