Sembawang E&C undertook the majority of the civil works projects which comprised the Fuel Oil Storage Terminal Ph 2 and Ph 3 projects, the site preparation works, building works including its services. The entire work scope included the engineering design, construction and commissioning of fixed cone tanks and foundations, extensive soil treatment and infrastructure development, administration and turbine buildings and the balance of plant works.